SHEDS & GARAGES

Shed & Garage

Options and Colors

  • SITE PREPARATION

    Gravel Pad preparation, remove sod from an area slightly bigger than your sheds foot print. Remove any dirt as necessary to level the area.

    Level a pad of 3/4" limestone, 3" - 4" deep, Two (2) feet bigger than your sheds dimensions. This will provide for drainage around your shed.

    Tamp the gravel down until flat and level. A Border of pressure treated lumber or paver blocks will help keep the stone in place, but is not required.

    Cinder Blocks are not recommended for use with our shed installation

  • DELIVERY

    Fisher Structures can deliver to a large geographical area. Delivery is done with a special trailer and professional driver directly to your site. Our professional driver will need approximately 40 foot clearance in front of the proposed site. All obstruction must be removed, such as trees, obstacles, etc. from the area.  Please contact us for delivery fees, pricing is based on mileage from point of origin to your site.